A Step-by-Step Walkthrough on
How to Set Up a Self-Service Car Wash
A Complete Guide for Investors
STEP 1: Property and Location
1. Property Ownership or Lease Rights
The investor must own the property or have the right to lease it.
2. Development Conditions / Zoning Plan
- If there is no local zoning plan, an application must be submitted for a decision on development conditions.
- The plot must be zoned for commercial or industrial use.
STEP 2: Documents and Administrative Decisions
1. Decision on Development Conditions (if required)
The following documents must be submitted to the Department of Urban Planning and Architecture at City Hall:
- An application for a decision on development conditions, including:
- A map defining the boundaries of the site (2 copies, scale 1:500 or 1:1000).
- A project description, including:
- Water and energy requirements and the method of wastewater disposal.
- Building dimensions (floor plans and cross-sections).
- The project’s environmental impact.
- Transportation access (access to a public road and parking spaces).
- Retail space, if a retail store is planned.
In the event of a denial, an appeal may be filed with the Local Government Appeals Board within 14 days.
2. Car Wash Design and Hydrological Report
- A car wash layout is prepared.
- A hydrological report is prepared by a licensed designer for the State Water Management Authority.
3. Building Permit
To obtain a building permit, the following documents must be submitted:
- An application for a building permit.
- Four copies of the construction design, along with the required opinions and approvals.
- A statement confirming the right to use the property for construction purposes.
- A decision on development conditions (if required).
The investor’s designer adapts the construction design to local conditions.
4. Building Permit Becoming Final
After receiving the building permit, the investor must wait until the decision becomes final. Only then can construction work begin.
STEP 3: Start of Construction
5. Beginning of Construction Work
The investor must arrange for:
- A construction manager.
- A land surveyor who:
- Marks out the outline of the concrete slab.
- Establishes the designated “zero” reference point.
The construction plans and building permit must be available on-site.
STEP 4: Groundworks and Underfloor Heating
6. Construction of the Car Wash Floor (Heated Concrete Slab)
The work is carried out in accordance with the construction design and includes, among other things:
- Excavation and compaction of the ground.
- Pouring a concrete base.
- Construction of drainage channels.
- Insulation of the concrete slab (plastic sheeting and polystyrene).
- Installation of the lower and upper reinforcement layers.
- Installation of the underfloor heating system (20 mm PEX pipes).
- Installation of all conduits and connections (water, electrical, and control cables).
- Installation of the anti-freeze system (nozzles, brushes, and sump).
- Pouring the upper concrete layer.
- Final grinding of the floor surfaces.
- Installation of galvanized drainage grates.
The scope and cost of the work may vary depending on site conditions.
STEP 5: Utilities and Infrastructure
7. Utility Connections
The following utilities are routed to the car wash site in accordance with